Enquiries: 0420 906 007 (Ron)

A great tagline here

For this project, On Point Piling determined shoring was the best solution, which is a cost-efficient alternative to contiguous piles in circumstances when there are no heavy loads nearby.

Importantly, the shoring is temporary, rather than a long-term solution.

For this project, we drilled piles to allow for universal columns to be inserted, then we added timber sleepers in between the columns to ensure the building was safe and ready for excavation.

Our client was thrilled with our team’s efficient, economical solution.

Enquiries

Want to discuss your project with us? Send On Point Piling an enquiry and we will be in touch shortly.

    Project Gallery