Featured Projects

See what we can do

View some of the recent On Point Piling projects underway or completed in Sydney. Interested to learn more? Get in touch with us today to discuss your own project, and learn how the On Point Piling team can assist in making your dream build a reality.

Freight Line Piling, Mascot

On Point Piling were tasked to drill 1050 diameter bored piles with casings 14 metres deep as part of a Sydney freight duplication project. […]

Read More… from Freight Line Piling, Mascot

CFA Pile Drilling, Whale Beach

This Whale Beach job consists of 500 diameter CFA piles ranging from 7 to 11 metres in depth utilising the Geax EK40 rig with great success! […]

Read More… from CFA Pile Drilling, Whale Beach

Rail Line Pile Drilling Works

The OPP team was hard at work on the rail drilling 450 and 600 diameter piles for a segregation fence using our Tescar CF3 and CF3S units. […]

Read More… from Rail Line Pile Drilling Works

Contiguous Piling Alexandria

Earlier the year we installed over 600 hand piles 400 diameter inside multiple factory units for Ace Demolition and Excavation. Pile depth varied between 3.0 – 8.0 meters while the roof was still on! […]

Read More… from Contiguous Piling Alexandria

Contiguous Piling, Parramatta

On Point Piling installed 124 x 450 diameter CFA piles with depth varying from 6.5 – 8.0 metres deep for 2 level basment. Total lineal metres of piers over 840 metres and all completed in 3 weeks! […]

Read More… from Contiguous Piling, Parramatta

Contiguous Piling, North Bondi

On Point Piling hand-piling team executed over 200 x 300 diameter contiguous hand piers from 4.0 – 9.0 meters in depth to create this North Bondi basement! […]

Read More… from Contiguous Piling, North Bondi

Contiguous Piling, Rose Bay 2

On Point Piling recently completed 328 piles, with 450mm diameter, totaling 2,500 lineal meters of contiguous concrete piles in our latest Rose Bay project, to allow excavation for a 2 level car park facility. […]

Read More… from Contiguous Piling, Rose Bay 2

Contiguous Piling, Maroubra

For this ambitious project, the design of the property required a method to anchor and reinforce the bottom of the pier into rock, so we implemented Piling using the Rock Dowel Method. […]

Read More… from Contiguous Piling, Maroubra

Shoring, Darling Point

For this project, On Point Piling determined shoring was the best solution, which is a cost-efficient alternative to contiguous piles in circumstances when there are no heavy loads nearby. […]

Read More… from Shoring, Darling Point

Underpinning, Annandale

For this project, our client wanted to create a basement in a 1950s home that was built on a boundary line, which posed potential complications. […]

Read More… from Underpinning, Annandale

Contiguous Piling, Rose Bay

For this large contiguous piling project in Rose Bay, we inserted 400+ piles, totaling over 2,700 metres drilled. Done in 6 weeks, on time and on budget! […]

Read More… from Contiguous Piling, Rose Bay

Contiguous Piling, Rosebery

The On Point Piling team collaborated with a client who wanted to construct a basement which extended all the way to his property boundary. […]

Read More… from Contiguous Piling, Rosebery