Enquiries: 0420 906 007 (Ron)

On time and on budget

Earlier the year we installed over 600 hand piles 400 diameter inside multiple factory units for Ace Demolition and Excavation. Pile depth varied between 3.0 – 8.0 meters while the roof was still on.

Enquiries

Want to discuss your project with us? Send On Point Piling an enquiry and we will be in touch shortly.

    Project Gallery