CFA Pile Drilling, Whale Beach
Big views, big results
After 10 weeks of drilling on a very steep site with stunning ocean views we can finally see the results.
On Point Piling deployed one of our Geax EK40 rigs, this rig has expandable tracks which allows us to traverse difficult ground without folding the mast.
The job consists of 500 diameter CFA piles ranging from 7 to 11 metres in depth.