Rail Line Pile Drilling Works
Sorting rail without fail
The OPP team was hard at work on the rail drilling 450 and 600 diameter piles for a segregation fence.
We have deployed our Tescar CF3 and CF3S to work inside the rail corridor as well as our talented and accredited team of operators and spotters. These rigs are able to travel under power lines, bridges as well as between the posts with ease. Both rigs drilled through hard sandstone in some locations.