On Point Piling were tasked to drill 1050 diameter bored piles with casings 14 metres deep as part of a Sydney freight duplication project. […]
This Whale Beach job consists of 500 diameter CFA piles ranging from 7 to 11 metres in depth utilising the Geax EK40 rig with great success! […]
The OPP team was hard at work on the rail drilling 450 and 600 diameter piles for a segregation fence using our Tescar CF3 and CF3S units. […]
Earlier the year we installed over 600 hand piles 400 diameter inside multiple factory units for Ace Demolition and Excavation. Pile depth varied between 3.0 – 8.0 meters while the roof was still on! […]
On Point Piling installed 124 x 450 diameter CFA piles with depth varying from 6.5 – 8.0 metres deep for 2 level basment. Total lineal metres of piers over 840 metres and all completed in 3 weeks! […]
On Point Piling hand-piling team executed over 200 x 300 diameter contiguous hand piers from 4.0 – 9.0 meters in depth to create this North Bondi basement! […]
On Point Piling recently completed 328 piles, with 450mm diameter, totaling 2,500 lineal meters of contiguous concrete piles in our latest Rose Bay project, to allow excavation for a 2 level car park facility. […]
For this ambitious project, the design of the property required a method to anchor and reinforce the bottom of the pier into rock, so we implemented Piling using the Rock Dowel Method. […]
For this project, On Point Piling determined shoring was the best solution, which is a cost-efficient alternative to contiguous piles in circumstances when there are no heavy loads nearby. […]
For this project, our client wanted to create a basement in a 1950s home that was built on a boundary line, which posed potential complications. […]
For this large contiguous piling project in Rose Bay, we inserted 400+ piles, totaling over 2,700 metres drilled. Done in 6 weeks, on time and on budget! […]